Welding services in Kazakhstan

Сварочные работы в Казахстане

Industrial welding is the joining of metal elements with perfect continuity through pressure, heat, or a combination of both; the appropriate method is selected based on the metals, their thickness, surface access, and other factors. The main advantage of industrial welding is that no additional components are required for assembly. However, welding efficiency depends on the chosen materials and technologies.

Industrial welding services: processes

Core industrial welding processes for achieving optimal results:

  • Gas Welding: A simple and effective industrial welding process using a blowtorch and a mixture of fuel gas and oxidant gas, such as acetylene and oxygen, to create the necessary flame. This method provides the high temperatures required for welding.
  • TIG (Arc): Tungsten Inert Gas welding uses an electric arc, an inert gas, and a tungsten electrode. The use of a neutral gas, typically argon, protects parts from oxidation and ensures a perfect joint, especially for precision work.
  • MIG-MAG: Combines two processes: MIG (Metal Inert Gas) and MAG (Metal Active Gas). MIG uses an inert gas (e.g., argon or helium), while MAG uses an active gas (e.g., argon/CO2 or argon/oxygen). This process protects the electrode and the weld pool; it is suitable for spot welding and welding thick materials such as stainless steel, aluminum, and steel.
  • Plasma: An ideal process for construction machinery, similar to TIG welding. It is carried out by creating an arc between the workpiece and a non-consumable electrode, using an additional gas, typically argon (sometimes with hydrogen). A copper nozzle protects the electrode and is continuously water-cooled to prevent overheating.

Welding Technologies at Our Company

“100 TONN.KZ” performs complex welding installations for:

Our personnel are proficient in all major welding technologies, including MMA (Manual Metal Arc), TIG, and MAG. We work with non-standard steel grades and possess the expertise to correctly draft Welding Procedure Specifications (WPS) to ensure seam quality across various materials.

The company is equipped with modern welding machinery, primarily from European manufacturers. We have established relationships with suppliers of welding inverters and consumables.

We organize welding and assembly teams to ensure maximum welding speed without compromising quality. The “100 TONN” holding operates its own non-destructive testing (NDT) laboratory. Consequently, our welders are accustomed to producing joints subjected to X-ray, ultrasonic, and other types of inspection.

We offer our employees excellent working conditions and provide effective personal protective equipment (PPE). This allows us to attract the industry’s best specialists. At our company, welders undergo regular training and professional development.

“100 TONN.KZ” can organize welding at sub-zero temperatures without loss of quality. We are capable of working in extreme conditions and execute projects at hazardous production facilities, including chemical and oil refineries, ore-dressing plants, and pulp and paper mills. We also handle the welding of boiler and lifting equipment.

Our company offers comprehensive services for mechanical, electrical, and welding installation. We possess specialized equipment for flushing process piping to remove contaminants left behind after welding. This procedure is essential for hydraulic and lubrication piping systems.

Choosing a Contractor for Welding Services in Kazakhstan

Entrust your welding projects to an experienced team of professionals! 100 TONN.KZ is a reliable partner in the field of welding, providing high-quality services throughout Kazakhstan. Regardless of the project’s size or complexity, our specialists are ready to bring your ideas to life with flawless quality and on schedule. Choose 100 TONN.KZ for your next welding project and see our reliability and professionalism for yourself!

FAQ or Frequently Asked Questions

1) What types of welding do you use?

Our welders and production specialists are proficient in all major types of welding: Manual Metal Arc (MMA), manual Tungsten Inert Gas (TIG), and semi-automatic (MIG/MAG). We are capable of welding various types of steel while complying with all industry standards.

2) What materials do you use for welding operations?

The quality of materials largely determines the quality of the finished joints. Therefore, we carefully select electrodes, wire, shielding gases, and mixtures. We only use certified products from verified suppliers. On-site, we perform incoming inspections and monitor storage conditions. We verify the condition of welding rods and the purity of gases before starting work.

3) Do you provide a warranty for welding work?

Our warranty is a minimum of 12 months. The specific duration depends on the pipeline category and the complexity of the work performed.

4) What is included in the scope of welding service activities?

Site organization: establishing storage and kitting areas for primary and consumable materials for pipe installation, as well as pre-assembly areas. Implementing measures to ensure safe working conditions at welder workstations. During operations, the following tasks are addressed: cleaning surfaces to be welded, cutting workpieces to size, beveling/edge preparation, assembly of joints with required gaps, seam fabrication, preparing seams for non-destructive testing (NDT), and quality control using NDT methods to the extent defined by the design documentation and pipeline category.

5) How much does it cost to perform welding work in Kazakhstan?

The minimum rate per meter of a permanent joint is 75,000 tenge. The price depends on the specific features of the project and is influenced by the welding method, workpiece material, wall thickness, and other factors.

Our projects

All projects
Relocation of printing equipment in India
Open project
Installation of a printing press in India
  • Republic of India, Satara
  • 2.04.2026
  • Works
    Mounting, Reconciliation
  • Industry
    Printing
Moving the QIAOSEN STDZ630-19-1901 press using the gantry system
Open project
Installation of a Heavy-Duty Press
  • Karaganda Region, Republic of Kazakhstan
  • 14.10.2025
  • Works
    Moving, Rigging
  • Industry
    Mechanical Engineering
Installation of equipment for iron casting and machining shops in Kazakhstan
Open project
New auto component plant in Kazakhstan prepares for launch
  • Kostanay Region, Republic of Kazakhstan
  • 7.09.2025
  • Works
    Mounting, Moving, Reconciliation, Rigging
  • Industry
    Automotive industry
HELLER FT 8000 machine rigging in Kazakhstan
Open project
Installation of Machine Tools in Pavlodar
  • Pavlodar
  • 7.08.2025
  • Works
    Mounting, Moving, Reconciliation, Rigging
  • Industry
    Mechanical Engineering
Relocation of RQQ machines in Ekibastuz
Open project
Installation of RQQ machines
  • Ekibastuz, Republic of Kazakhstan
  • 21.03.2025
  • Works
    Moving, Rigging
  • Industry
    Mechanical Engineering
Press assembly in Rudny
Open project
Installation of a press in Kostanay region
  • Republic of Kazakhstan, Rudny
  • 7.03.2025
  • Works
    Moving, Rigging
  • Industry
    Production of building materials
Tilting a plate for the heavy Schuler MH-10000 press
Open project
Installation of two presses and an oil tank at a production facility in Ekibastuz
  • Ekibastuz, Republic of Kazakhstan
  • 21.02.2025
  • Works
    Mounting, Moving, Rigging
  • Industry
    Metallurgy and metalworking
Installation of dosing unit equipment in Kazakhstan
Open project
Installation of dosing unit for an automotive parts manufacturer
  • Kostanay, Republic of Kazakhstan
  • 7.02.2025
  • Works
    Mounting
  • Industry
    Automotive industry
Installation of a thermal regeneration unit in Kostanai
Open project
Installation of a thermal regeneration unit
  • Kostanay, Republic of Kazakhstan
  • 21.01.2025
  • Works
    Mounting
  • Industry
    Automotive industry, Metallurgy and metalworking
Assembly and connection of SOMA Optima 1 printing machine in Tashkent
Open project
Installation of the SOMA Optima 1 printing press in Tashkent
  • Republic of Uzbekistan, Tashkent
  • 7.01.2025
  • Works
    Mounting
  • Industry
    Printing
Mounting the printing machine Mounting the printing machine
Open project
Mounting the printing machine
  • Bishkek, Kyrgyz Republic
  • 21.12.2024
  • Works
    Mounting, Rigging
  • Industry
    Printing
Relocation of SOMA OPTIMA 1 printing press from Uzbekistan to Russia
Open project
Relocation of SOMA OPTIMA 1 printing press from Uzbekistan to Russia
  • Republic of Uzbekistan, Tashkent
  • 7.12.2024
  • Works
    Dismantling, Mounting, Rigging
  • Industry
    Printing
Rigging of horizontal forging machine in Kazakhstan
Open project
Rigging of the horizontal forging machine
  • Republic of Kazakhstan
  • 21.05.2024
  • Works
    Moving, Rigging
  • Industry
    Mechanical Engineering
Placement of a SACMI press into the pit (Samarkand)
Open project
Installation of two SACMI PH3200 presses, a furnace and roller dryer in Uzbekistan
  • Republic of Uzbekistan, Samarkand
  • 7.05.2024
  • Works
    Mounting, Rigging
  • Industry
    Ceramic production
Unloading and installation of a straightening machine in Aktobe (Kazakhstan)
Open project
Unloading and installation of a straightening machine in Aktobe (Kazakhstan)
  • Aktobe, Republic of Kazakhstan
  • 21.04.2024
  • Works
    Moving, Rigging
  • Industry
    Metallurgy and metalworking
Installation of Soma Optima printing press in Kazakhstan
Open project
Installation of a Soma Optima flexographic printing press in Kazakhstan
  • Republic of Kazakhstan, Shymkent
  • 7.04.2024
  • Works
    Mounting
  • Industry
    Printing, Pulp and paper industry
Unloading and Installation of BOSCH Boilers (Shymkent, Kazakhstan)
Open project
Unloading and installation of BOSCH boilers
  • Republic of Kazakhstan, Shymkent
  • 21.03.2024
  • Works
    Mounting, Moving, Rigging
  • Industry
    Logistics
Open project
Installation of a boiler unit drum at a CHPP (Combined Heat and Power Plant)
  • Republic of Kazakhstan
  • 7.03.2024
  • Works
    Rigging
  • Industry
    Energy industry
Installation of heat treatment line at the KamlitKZ factory
Open project
Installation of the ELPO heat treatment line at a factory in Kostanay
  • Kostanay, Republic of Kazakhstan
  • 21.02.2024
  • Works
    Mounting
  • Industry
    Automotive industry
Installation of Soma Optima 2 printing machine in Kazakhstan
Open project
SOMA Optima 2 printing press installation in Ust-Kamenogorsk
  • Oskemen, Republic of Kazakhstan
  • 7.02.2024
  • Works
    Mounting
  • Industry
    Printing
Installation of Froelich-Kluepfel equipment at the KamLitKZ plant Installation of Froelich-Kluepfel equipment at the KamLitKZ plant
Open project
Installation of Froelich-Kluepfel equipment at the KamLitKZ plant
  • Kostanay, Republic of Kazakhstan
  • 21.12.2023
  • Works
    Mounting, Rigging
  • Industry
    Automotive industry
Installation of a drum at a cigarette factory in Uzbekistan
Open project
Relocation of the Drum Within the Workshop
  • Republic of Uzbekistan, Samarkand
  • 7.12.2023
  • Works
    Moving
  • Industry
    Tobacco production
Relocation and large-unit assembly of Currency LC-1232 offset printing press in Uzbekistan Relocation and large-unit assembly of Currency LC-1232 offset printing press in Uzbekistan
Open project
Relocation and large-unit assembly of Currency LC-1232 offset printing press in Uzbekistan
  • Republic of Uzbekistan, Zangiota District, Tashkent Region
  • 21.11.2023
  • Works
    Moving, Rigging
  • Industry
    Printing
Installation of four Wartsila gas generator sets
Open project
Installation of four Wartsila gas generator units
  • Aktau, Republic of Kazakhstan
  • 7.11.2023
  • Works
    Mounting, Moving, Rigging
  • Industry
    Energy industry
Installation of equipment at the production of building materials facility in Almaty region Installation of equipment at the production of building materials facility in Almaty region
Open project
Installation of equipment at the production of building materials facility in Almaty region
  • Almaty Region, Republic of Kazakhstan
  • 21.10.2023
  • Works
    Mounting, Welding work
  • Industry
    Production of building materials
Installation of a shot blasting machine in Kazakhstan
Open project
Installation of shot blasting systems
  • Kostanay Region, Republic of Kazakhstan
  • 7.10.2023
  • Works
    Mounting
  • Industry
    Automotive industry
Installation of a liquid carbon dioxide vessel
Open project
Installation of Abrasive Blasting Units
  • Republic of Kazakhstan
  • 21.09.2023
  • Works
    Mounting, Rigging, Welding work
  • Industry
    Mechanical Engineering
Extruder Installation in Uzbekistan Extruder Installation in Uzbekistan
Open project
Extruder Installation in Uzbekistan
  • Republic of Uzbekistan
  • 7.09.2023
  • Works
    Mounting
  • Industry
    Polymers

    Let's discuss your project