“100 TONN.KZ” installed equipment at a construction site for a plant producing thermal insulation panels.
The project included installation of:
- packaging lines
- afterburning system for gases rising from the furnace
Our team delivered high-quality mechanical installation and welding services at an optimal cost. Challenging site access and the lack of infrastructure in the industrial area did not impede the work.