Installation and Alignment of Equipment in Kazakhstan

Установка и выверка оборудования в Казахстане

Leveling and alignment of process equipment are processes used to ensure precise installation and positioning of various devices, production machines, or machine tools in industrial settings.

  • Leveling usually includes checking and correcting geometric parameters such as angles, parallelism, perpendicularity, and straightness of various elements. This is necessary for proper mechanism operation, preventing wear, and increasing productivity.
  • Alignment involves detecting and correcting any offsets in centers or axes of rotation. For example, alignment is used to align shafts of engines and drives to avoid vibrations and bearing damage.

Both processes play a key role in ensuring efficient and safe operation of industrial machinery, preventing downtime, and extending service life.

Tools

The following tools are used for leveling and alignment of process equipment:

  • Optical instruments
  • Laser devices for precise installation and adjustment
  • Special fixtures for anchoring to foundations
  • Materials for grouting under installed devices/mechanisms

Thus, these works use high-precision optical and laser instruments, as well as special materials and fixtures for securing equipment.

Equipment Leveling and Alignment Service at Our Company

«100 TONN.KZ» performs:

  • Leveling — adjusting the position of production equipment elements horizontally and vertically
  • Alignment — correcting position along the axis of rotation

Leveling and alignment are required when a production unit has moving parts that must be positioned in space with high precision. These operations are an integral part of projects for installing machine tools, machining centers, various drums, and paper-making machines.

We have specialized equipment for leveling and alignment, including electronic levels and European-made laser systems. These devices provide much higher accuracy and speed of work. They eliminate distortions that are almost inevitable with conventional spirit levels.

Our company employs personnel with extensive experience in leveling and alignment. To correctly perform measurements and adjust equipment units in space, we carefully study documentation from the manufacturer, designers, and construction contractors.

For adjusting equipment position, we use calibration plates or other shimming materials. Once all elements are in the design position, the production unit is fixed to the foundation.

Correct positioning of equipment units in space affects parameters such as:

  • Ability to reach optimal operating modes
  • Productivity
  • Energy efficiency
  • Operational reliability
  • Wear rate and service life

You can order leveling and alignment as part of a installation project or as a standalone service.

Importance of Professionalism

Professionalism in leveling and alignment of process equipment is critically important for:

  • Extending service life and reducing costs for modernization and replacement of units
  • Reducing wear of mechanical parts, ensuring proper lubrication, and lowering vibration levels
  • Precise installation of equipment in the design position using laser leveling
  • Ensuring reliable operation and reducing operating costs during installation of industrial mechanisms and structures

Company «100 TONN.KZ» guarantees the competence and professionalism of its workers, who are experts in balancing, alignment, leveling, and adjustment methods. Their experience and knowledge are key to quality performance..

FAQ (Frequently Asked Questions)

1) What is included in equipment installation?

Typically, such projects involve unloading production units from transport, moving them across the facility to the installation site, unpacking, lifting onto the foundation (in some cases to a height of several dozen meters), or lowering into a pit. Often, before installation, it is necessary to perform rotation: turning the equipment from the horizontal transport position to the vertical operational position. We also handle this operation. We can further complement the project with alignment, mechanical, and electrical installation.

2) On what foundation can equipment be installed?

It is important that the foundation meets the requirements of the machine, press, or line manufacturer. Only then can safe and efficient operation be expected. We install heavy-duty equipment on foundations of any height, utilizing our gantry systems and strand jacks to get the job done.

3) Do you provide a warranty for equipment installation and alignment?

Yes, we do, as we are confident in the quality of our work. A warranty is especially important for alignment. If the operation were performed unprofessionally, the moving parts of the machine would fail quickly. The standard warranty period is 12 months, which can be extended to 36 months upon the client’s request.

4) How does mounting installation (montage) differ from simple installation?

Assembly (montage) involves a large number of bolted connections and sometimes welding. Mechanical assembly is often accompanied by electrical work and connection to utilities. “Installation” usually refers to cases where the production unit arrives on-site as a single monoblock. If there are several elements but extensive assembly is not required, a “large-unit assembly” service can be ordered.

5) How much does equipment installation and alignment cost in Kazakhstan?

The cost varies from project to project. The heavier and larger the machine or press, and the more cramped the site conditions, the more expensive the service. The price for alignment starts at 80,000 tenge per hour for a specialist equipped with the necessary tools.

Our projects

All projects
Relocation of printing equipment in India
Open project
Installation of a printing press in India
  • Republic of India, Satara
  • 2.04.2026
  • Works
    Mounting, Reconciliation
  • Industry
    Printing
Moving the QIAOSEN STDZ630-19-1901 press using the gantry system
Open project
Installation of a Heavy-Duty Press
  • Karaganda Region, Republic of Kazakhstan
  • 14.10.2025
  • Works
    Moving, Rigging
  • Industry
    Mechanical Engineering
Installation of equipment for iron casting and machining shops in Kazakhstan
Open project
New auto component plant in Kazakhstan prepares for launch
  • Kostanay Region, Republic of Kazakhstan
  • 7.09.2025
  • Works
    Mounting, Moving, Reconciliation, Rigging
  • Industry
    Automotive industry
HELLER FT 8000 machine rigging in Kazakhstan
Open project
Installation of Machine Tools in Pavlodar
  • Pavlodar
  • 7.08.2025
  • Works
    Mounting, Moving, Reconciliation, Rigging
  • Industry
    Mechanical Engineering
Relocation of RQQ machines in Ekibastuz
Open project
Installation of RQQ machines
  • Ekibastuz, Republic of Kazakhstan
  • 21.03.2025
  • Works
    Moving, Rigging
  • Industry
    Mechanical Engineering
Press assembly in Rudny
Open project
Installation of a press in Kostanay region
  • Republic of Kazakhstan, Rudny
  • 7.03.2025
  • Works
    Moving, Rigging
  • Industry
    Production of building materials
Tilting a plate for the heavy Schuler MH-10000 press
Open project
Installation of two presses and an oil tank at a production facility in Ekibastuz
  • Ekibastuz, Republic of Kazakhstan
  • 21.02.2025
  • Works
    Mounting, Moving, Rigging
  • Industry
    Metallurgy and metalworking
Installation of dosing unit equipment in Kazakhstan
Open project
Installation of dosing unit for an automotive parts manufacturer
  • Kostanay, Republic of Kazakhstan
  • 7.02.2025
  • Works
    Mounting
  • Industry
    Automotive industry
Installation of a thermal regeneration unit in Kostanai
Open project
Installation of a thermal regeneration unit
  • Kostanay, Republic of Kazakhstan
  • 21.01.2025
  • Works
    Mounting
  • Industry
    Automotive industry, Metallurgy and metalworking
Assembly and connection of SOMA Optima 1 printing machine in Tashkent
Open project
Installation of the SOMA Optima 1 printing press in Tashkent
  • Republic of Uzbekistan, Tashkent
  • 7.01.2025
  • Works
    Mounting
  • Industry
    Printing
Mounting the printing machine Mounting the printing machine
Open project
Mounting the printing machine
  • Bishkek, Kyrgyz Republic
  • 21.12.2024
  • Works
    Mounting, Rigging
  • Industry
    Printing
Relocation of SOMA OPTIMA 1 printing press from Uzbekistan to Russia
Open project
Relocation of SOMA OPTIMA 1 printing press from Uzbekistan to Russia
  • Republic of Uzbekistan, Tashkent
  • 7.12.2024
  • Works
    Dismantling, Mounting, Rigging
  • Industry
    Printing
Rigging of horizontal forging machine in Kazakhstan
Open project
Rigging of the horizontal forging machine
  • Republic of Kazakhstan
  • 21.05.2024
  • Works
    Moving, Rigging
  • Industry
    Mechanical Engineering
Placement of a SACMI press into the pit (Samarkand)
Open project
Installation of two SACMI PH3200 presses, a furnace and roller dryer in Uzbekistan
  • Republic of Uzbekistan, Samarkand
  • 7.05.2024
  • Works
    Mounting, Rigging
  • Industry
    Ceramic production
Unloading and installation of a straightening machine in Aktobe (Kazakhstan)
Open project
Unloading and installation of a straightening machine in Aktobe (Kazakhstan)
  • Aktobe, Republic of Kazakhstan
  • 21.04.2024
  • Works
    Moving, Rigging
  • Industry
    Metallurgy and metalworking
Installation of Soma Optima printing press in Kazakhstan
Open project
Installation of a Soma Optima flexographic printing press in Kazakhstan
  • Republic of Kazakhstan, Shymkent
  • 7.04.2024
  • Works
    Mounting
  • Industry
    Printing, Pulp and paper industry
Unloading and Installation of BOSCH Boilers (Shymkent, Kazakhstan)
Open project
Unloading and installation of BOSCH boilers
  • Republic of Kazakhstan, Shymkent
  • 21.03.2024
  • Works
    Mounting, Moving, Rigging
  • Industry
    Logistics
Open project
Installation of a boiler unit drum at a CHPP (Combined Heat and Power Plant)
  • Republic of Kazakhstan
  • 7.03.2024
  • Works
    Rigging
  • Industry
    Energy industry
Installation of heat treatment line at the KamlitKZ factory
Open project
Installation of the ELPO heat treatment line at a factory in Kostanay
  • Kostanay, Republic of Kazakhstan
  • 21.02.2024
  • Works
    Mounting
  • Industry
    Automotive industry
Installation of Soma Optima 2 printing machine in Kazakhstan
Open project
SOMA Optima 2 printing press installation in Ust-Kamenogorsk
  • Oskemen, Republic of Kazakhstan
  • 7.02.2024
  • Works
    Mounting
  • Industry
    Printing
Installation of Froelich-Kluepfel equipment at the KamLitKZ plant Installation of Froelich-Kluepfel equipment at the KamLitKZ plant
Open project
Installation of Froelich-Kluepfel equipment at the KamLitKZ plant
  • Kostanay, Republic of Kazakhstan
  • 21.12.2023
  • Works
    Mounting, Rigging
  • Industry
    Automotive industry
Installation of a drum at a cigarette factory in Uzbekistan
Open project
Relocation of the Drum Within the Workshop
  • Republic of Uzbekistan, Samarkand
  • 7.12.2023
  • Works
    Moving
  • Industry
    Tobacco production
Relocation and large-unit assembly of Currency LC-1232 offset printing press in Uzbekistan Relocation and large-unit assembly of Currency LC-1232 offset printing press in Uzbekistan
Open project
Relocation and large-unit assembly of Currency LC-1232 offset printing press in Uzbekistan
  • Republic of Uzbekistan, Zangiota District, Tashkent Region
  • 21.11.2023
  • Works
    Moving, Rigging
  • Industry
    Printing
Installation of four Wartsila gas generator sets
Open project
Installation of four Wartsila gas generator units
  • Aktau, Republic of Kazakhstan
  • 7.11.2023
  • Works
    Mounting, Moving, Rigging
  • Industry
    Energy industry
Installation of equipment at the production of building materials facility in Almaty region Installation of equipment at the production of building materials facility in Almaty region
Open project
Installation of equipment at the production of building materials facility in Almaty region
  • Almaty Region, Republic of Kazakhstan
  • 21.10.2023
  • Works
    Mounting, Welding work
  • Industry
    Production of building materials
Installation of a shot blasting machine in Kazakhstan
Open project
Installation of shot blasting systems
  • Kostanay Region, Republic of Kazakhstan
  • 7.10.2023
  • Works
    Mounting
  • Industry
    Automotive industry
Installation of a liquid carbon dioxide vessel
Open project
Installation of Abrasive Blasting Units
  • Republic of Kazakhstan
  • 21.09.2023
  • Works
    Mounting, Rigging, Welding work
  • Industry
    Mechanical Engineering
Extruder Installation in Uzbekistan Extruder Installation in Uzbekistan
Open project
Extruder Installation in Uzbekistan
  • Republic of Uzbekistan
  • 7.09.2023
  • Works
    Mounting
  • Industry
    Polymers

    Let's discuss your project

    Provide your contact details and the services you are interested in. Our specialists will contact you as soon as possible

    By clicking on the button, you consent to the processing of your personal data. Privacy Policy