Our team installed two shot blasting chambers at the manufacturing facility of automotive components in the Kostanay region of the Republic of Kazakhstan. The work was carried out under the supervision of chief engineers.

For the installation, we used:
- Truck crane with lifting capacity of 16 tons
- Truck crane with lifting capacity of 50 tons
- Aerial elevator
- Forklift – 2 units
- Scissor elevator – 2 units
- Power tool
Assembly and installation of blasting equipment
Installation of a shot blasting system in Kazakhstan
Main project works
- Development of a work execution plan (WEP)
- Assembly and installation of two shot blasting machines
- Chimney installation