“100 TONN.KZ” installed equipment at a construction site for a plant producing thermal insulation panels.
The project included installation of:
- packaging lines
- afterburning system for gases rising from the furnace
Our team provided quality mechanical installation and welding work at an optimal cost. The difficult access to the site and the lack of infrastructure in the industrial area did not hinder the task.