“100 TONN MONTAGE” transported a tobacco drum across the plant site, positioned the equipment according to the project specifications, and secured it with bolted connections. The company’s team also dismantled the old drum and relocated it to a storage facility

Replacement of a tobacco drum in Uzbekistan
Replacement of a tobacco drum in Uzbekistan

Project features

The weight of each drum was 17 tons. For rigging, the crew used a GP60 gantry system, a set of transport trolleys with a load capacity of up to 80 tons, low-profile jacks, and manual winches.

Movement and installation of a tobacco drum in Samarkand
Movement and installation of a tobacco drum in Samarkand

Main project works

  • Unloading the container with the drum from the truck
  • Transporting the container from the gate to the installation site in the workshop
  • Opening the container and removing the drum from the frame
  • Installing the drum
  • Fabrication of a support cradle. Lowering and moving the used drum onto the cradle
  • Transporting the dismantled drum out of the workshop
Installation of a drum at a cigarette factory in Uzbekistan
Installation of a drum at a cigarette factory in Uzbekistan